Items where City Author is "Paraskevopoulos, Dimitris"
Kasapidis, G., Paraskevopoulos, D. ORCID: 0000-0002-7004-3263, Mourtos, I. & Repoussis, P. (2024). A Unified Solution Framework for Flexible Job Shop Scheduling Problems with Multiple Resource Constraints. European Journal of Operational Research, 320(3), pp. 479-495. doi: 10.1016/j.ejor.2024.08.010
Kasapidis, G. A., Dauzère-Pérèz, S., Paraskevopoulos, D. C. ORCID: 0000-0002-7004-3263 , Repoussis, P. P. & Tarantilis, C. D. (2023). On the Multi-Resource Flexible Job-Shop Scheduling Problem with Arbitrary Precedence Graphs. Production and Operations Management, 32(7), pp. 2322-2330. doi: 10.1111/poms.13977
Kasapidis, G. A., Paraskevopoulos, D. C. ORCID: 0000-0002-7004-3263, Repoussis, P. P. & Tarantilis, C. D. (2021). Flexible job shop scheduling problems with arbitrary precedence graphs. Production and Operations Management, 30(11), pp. 4044-4068. doi: 10.1111/poms.13501
Paraskevopoulos, D. C., Laporte, G., Repoussis, P. P. & Tarantilis, C. D. (2017). Resource constrained routing and scheduling: Review and research prospects. European Journal of Operational Research, 263(3), pp. 737-754. doi: 10.1016/j.ejor.2017.05.035
Armstrong, J., Preston, J., Potts, C. , Bektas, T. & Paraskevopoulos, D. (2017). Addressing nodal constraints on the capacity of railways. Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 231(5), pp. 637-646. doi: 10.1177/0954409717706271
Repoussis, P.P., Paraskevopoulos, D. C., Vazacopoulos, A. & Hupert, N. (2016). Optimizing emergency preparedness and resource utilization in mass-casualty incidents. European Journal of Operational Research, 255(2), pp. 531-544. doi: 10.1016/j.ejor.2016.05.047
Paraskevopoulos, D. C., Bektaş, T., Crainic, T. G. & Potts, C. N. (2016). A cycle-based evolutionary algorithm for the fixed-charge capacitated multi-commodity network design problem. European Journal of Operational Research, 253(2), pp. 265-279. doi: 10.1016/j.ejor.2015.12.051
Paraskevopoulos, D. C., Tarantilis, C. D. & Ioannou, G. (2016). An adaptive memory programming framework for the resource-constrained project scheduling problem. International Journal of Production Research, 54(16), pp. 4938-4956. doi: 10.1080/00207543.2016.1145814
Paraskevopoulos, D. C., Gürel, S. & Bektaş, T. (2016). The congested multicommodity network design problem. Transportation Research Part E: Logistics and Transportation Review, 85, pp. 166-187. doi: 10.1016/j.tre.2015.10.007